A guide for leaseholders who live in flats
We regularly check the condition of the homes we own. This
includes flats where you are the leaseholder but we are responsible
for the external structure of the building and communal areas.
This section explains how we plan for long-term maintenance to
these areas.
Repairs that are your responsibility
Your lease will list the repairs that are your responsibility
but these are likely to include:
- interior wall finishes such as plastering, tiling and
decoration
- electrical systems
- plumbing systems
- heating systems
- floor surfaces
- internal joinery
- kitchen and bathroom fittings
Repairs that are our responsibility
Your lease will list the repairs that are our responsibility and
are likely to include:
- window glass
- communal halls, staircases and landings
- communal services such as door entry phones, warden call
systems and lifts
- roofs
- foundations
- external and structural walls
- guttering and external drainage
- exterior doors and ironmongery
There are a number of different leases. Check your lease
for details.
How we plan for long-term maintenance
We regularly check the condition of communal areas and draw up
plans to repair or improve different parts of the building over a
number of years. For example, we may plan to repaint external
woodwork and internal woodwork in communal areas every five years
or to replace window frames after approximately 35 years.
We then estimate the cost of these works.
When we have drawn up our plan we will consult you about what we
propose and the timetable. We review these plans every five years
and will consult you on any changes we make and the effect on the
sinking fund you contribute to as part of your service charge.
The sinking fund is money that is built up from your monthly
contributions to pay for long term planned maintenance.
When we are about to do a specific work programme
In the months before we intend to do a particular work programme
we will:
- warn you in advance
- consult you about how the work will be done, and when it
will start
- give you a copy of the contactors cost estimate for the
work when it is above the limits set in the Landlord and Tenant Act
1985. Currently these are £50 on an individual property or £1,000
for a group of properties, whichever is the higher
- explain how we have split the costs among the
leaseholders
- explain how the work will be paid for, including how much
will come from the sinking fund
- give you at least a month to comment on the information
we've provided
If your scheme has a residents group
We will provide the group with a specification of the work
What to do if you are not happy with the work
If you are unhappy with what is proposed or the standard of the
work once it has been done, you can:
- use our
complaints
procedure.
- contact the Independent Housing Ombudsman.
Norman House
105-109 Strand
London
WC2R 0AA
020 7836 3630
The Ombudsman will not deal with your complaint until you have gone
through our complaints procedure.
- Contact the Leasehold Valuation Tribunal.
Symons House
Belgrave Street
Leeds LS2
0113 243 9744
- Contact your Housing Management
Officer for a copy of the long-term maintenance plan for your
home.